Showing posts with label CNG Tanks. Show all posts
Showing posts with label CNG Tanks. Show all posts

Thursday, November 26, 2009

The CNG GTO Tanks are installed!!

Its been a long and busy month. We turned the GTO over to Steve at Phoenix Energy to professionally mount the tanks and video tape the whole thing so you can see how its done.
The video turned out perfect. We have it posted up now on youtube. Please click the link below and see part one. Dont forget to see part two for the final cranking and running of the GTO.

http://www.youtube.com/watch?v=7GwGBoD3CVw

http://www.youtube.com/watch?v=hvLi0ZU3PHA

Tuesday, September 8, 2009

Progress on the Tanks Update

I have been wanting to send an update but there are so many good things going on this past week that its really been hard to decide whats most important. The most productive advance is that Mark is working with a really motivated tank supplier now. He is full of great ideas and Mark is setting up a meeting. We have figured that we may need to work three tanks into the GTO trunk to have sufficient range to make the legs between filling stations. Two big tanks in the floor of the trunk and one smaller tank under the package tray between the wheel wells. If our calculations are correct we hope to have an approximate range of 300-325 miles. More on what that will get us later. So I will consider this the tank status update for now so everyone knows what we hope to accomplish.

Monday, August 17, 2009

CNG Tank Racks

We met with James Vance at Cherokee Stamping in downtown Birmingham to have the dual tank brackets designed to fit both Airport Express Vans as well as the GTO. They will be custom designed and made of much stronger metal than your typical tank brackets. We have type two tanks with a spun fiberglass coating over the center part of the tank and the brackets will fit over the coating and have a rubber strip liner. Bolts will hold the straps around the tank. The base will have supports for the tank and welds attaching the strap. The supports will be welded to plate that will be bolted to the frame using wellnuts. The plate will be bolted directly into the frame of the vans as well as hopefully the frame underneath the trunk of the GTO. The GTO trunk has plenty of room for a couple of this size CNG tanks. No expected delivery date was established but will keep you posted.