Saturday, January 16, 2010

Final Preparation

Once the trailer was ready Mark drove the CNG GTO up the ramp and very slowly into the trailer.  We tied down the car to D rings in the floor of the trailer with tie down straps.  Joseph put the cover over and the cabinet doors were taped shut to be sure nothing came out.  Mark got the tree boxes of Route66GoatGas shirts and put them in the trailer.  Tools for the road were loaded.  Earlier while watching the car run, we found a loose coil wire and got that thing tightened back up. It was making a blue spark and you could see the reflection in the chrome under the hood.  Everything loose in the trailer we removed or secured.  Mark left heading for Memphis and was on his way.

No comments:

Post a Comment